- GUC, Tesla's design partner for the AI5 chip, reportedly gave Google's Axion and Microsoft's in-house chips priority for TSMC's limited 3nm (N3) capacity.
- As a result, the large-scale rollout of AI5 in Tesla vehicles has reportedly been pushed back to 2028.
- The report is a single unconfirmed X post with no corroborating documents in the cluster.